A lot more progress this week on the basement! 

My dad came over and knocked out the fireplace wall in about 5 minutes, like it was no big deal! I LOVE it! The mantle still needs another coat of stain and a coat of clear, that's why it's a bit lighter than the shelves. Eventually, Chad wants to paint the vent to blend in more. 


We got all the doors primed and 1 coat of paint on them! Just one more coat to go!

The bookshelves and wine cabinets have their final coats and are looking fabulous. The glass shelves for the wine cabinets have been ordered and should be in next week. 


The stair railing got finalized and it looks great!

The carpet has been ordered. As soon as we have word it's been delivered to the warehouse we can set up installation.


I installed a couple door knobs and the closet light is in.

Dad built the shelves for the bar and he's working on staining those.


Chad hung the mirror and the towel/toilet paper roll bars hung in the bathroom! Bathroom is done! =)

My dad got started on the counter top. He built the frame and put the wonder board down. This is what the tile will go on.  He also got a little bit of the tile started =)


We did two MAJOR Lowe's trips this week but I'm pretty sure we have purchased nearly everything we need to finish this basement off. (I'm sure there will be small things here and there we will need) But for the the most part I think the large expenses are done! I'm not sure if we should do a dance or cry....

What's next? 
Hang bi-pass doors
 Paint trim and doors
 Finish stair railing.
 Bar counter top, sink, faucet
Finish stairs: backs, trim, caulking & paint
 Hang mirror
Finish electrical & lighting: fireplace, bookshelves, face plates, closet light, outlets..etc
 Finish fireplace wall: stone and mantle
 Touch up paint
 Carpet install
 CLEAN!!!
 Back splash
 Bar shelves
 Covers for the holes in the wall for the water shut off and circuit breaker. 
 Fan in playroom. 
 Bar shelves
 Glass shelves for wine cabinet
Pulls and knobs on cabinets
Door knobs
Paint vent

This Weeks Costs
Door knobs & cabinet pulls - $200
Paint/Stain - $25
Lighting & Electrical - $115
Counter top - $425
Back splash - $450
Misc - $60
Wood for Shelves & Mantle - $55
Bathroom Mirror- $35
Towel Ring/Toilet paper holder - $13
Bar Faucet & Sink - $162
Fan - $85
Fireplace tile & air duct - $35

Returns - $67

This weeks total - $1,592

Project total - $11,942